Tender Notice
One set of hydraulic lifting platform for workshop
| Company Name: DIGA PHARMACEUTICAL GROUP CO., LTD | ||
| Reporting Department: Equipment Department, Contact Wang Anbo 18816307086 | ||
| Technical requirements: 1 hydraulic lifting platform, see the attached list for details. | ||
| Supplier: | ||
| Contact person and contact information: | ||
|
Name |
Equipment Requirements | Unit price |
| Hydraulic lifting platform 1 set | 1. Main body: lifting height 16.7-17m, rated load 1500kg, anti-skid checkered board table top (including protective frame, net size 1200*1400mm), lifting speed: 5-7 m/min (can be accelerated and optimized), double support hydraulic oil cylinder, lifting guide chain and safety rope double safety type, nylon guide wheel, lifting whole process with protective net (protective net is at least 5*5 galvanized woven iron wire, external 40 square tube as frame, and brush yellow and black warning line), the main material is made of national standard high-quality 20# steel, seals are imported, and the hydraulic oil station adopts domestic well-known brands. 2. Electrical and protection: the equipment adopts explosion-proof motor (secondary energy efficiency), explosion-proof electrical components, explosion-proof grade ExdeIIBT4, explosion-proof electric rolling shutter door, emergency stop, emergency manual lowering button and operation button are installed on the fifth floor of the 1. 2. 3. 4., with self-stop, self-locking, interlocking functions, walking alarm light alarm bell, door lock protection, emergency lowering valve, overload protection, oil pressure protection and fall prevention protection of oil. Load test on site Installation: The manufacturer is responsible for on-site measurement, production, installation and debugging before signing the contract, and providing added hydraulic oil. All cables shall be equipped with flame-retardant explosion-proof galvanized/explosion-proof pipes and explosion-proof conduits. The installation must comply with explosion-proof electrical operation specifications and GB50303-2011 electrical equipment installation construction and acceptance specifications. There shall be no non-flame-retardant cables, lax construction sealing and cable exposure. The selected installation personnel shall have special operation certificates stipulated by the state. 4. Data: The manufacturer is required to provide the quality certificate, instruction manual, certificate of approval, operation and debugging list, certificate of approval of all explosion-proof electrical appliances and cables, and incomplete inspection report data will not be accepted. |
|
| Total Quotation: | ||
| Payment method: 30% in advance, 70% of the total payment before delivery, 95% after installation and acceptance, and 5% warranty (12 months warranty) | ||
| Invoice: 13% VAT special invoice | ||
| Warranty period: one year after installation and commissioning | ||
| Arrival date: 45 days after advance payment, installation period 30 days | ||
| Place of arrival: Guangzhou Road, Wendengying Town, Wendeng District, Weihai City | ||
| Remarks: | ||
