Tender Notice
Handling, renovation and installation of outdoor sewage equipment on the first floor of scientific research building
Handling, renovation and installation project of outdoor sewage equipment on the first floor of the office buildingTender Notice
Basic information of 1. project
1. Project (material) name:Handling, renovation and installation project of outdoor sewage equipment on the first floor of the office building
2. Location of demand: 268 Tianrun Road, Wendeng Economic and Technological Development Zone, Weihai
3. Demand Overview: See Annex for details
4. Quality requirements: Comply with national mandatory standards and requirements of Party A
5. Time limit requirement: 30 days
6. Other requirements: quotation includes invoice
2. Supplier Qualification Requirements
1. A valid business license shall be provided for a legal person or other organization registered in the People's Republic of China.
2, must have the ability to independently bear civil liability.
3, must have a good business reputation and sound financial accounting system, and can issue special VAT invoices.
4. It must have a good record of paying taxes and social security funds in accordance with the law within 3 years, and there is no record of major violations in business activities.
5, must have the necessary equipment and professional and technical capabilities to perform the project. Relevant supporting materials (including but not limited to professional qualifications, past successful cases and contracts) shall be provided.
6. Other conditions stipulated by laws and regulations.
3. Registration Instructions
1. This tender invitation announcement shall end on [January] [10] of [2025] and will not be accepted within the time limit.
2. If you are interested in participating, please sort out the above information (seal) before the deadline for announcement,Send to dijiazbb@163.com in the form of mail;
Note: Please unify the mailNamed after "preliminary quotation of project name bidding unit name", please leave "contact person, position and contact information of the unit" (not less than two) in the body of the email.
3. Telephone number for consultation: [Li Wei 15106314392]]
4. After examination of qualified registration units, our staff will send detailed bidding documents by mail. Please check the mailbox in time. If you receive any, please reply and confirm by mail.
4. supervision and reporting methods
1. Reporting telephone number: 0631-3855888
2. Reporting Mailbox: zhengquanbu@dijiagroup.com
5. Other
The final interpretation of this tender belongs to our company. Please pay attention to the feedback information received by phone or email.
Annex
| Handling, renovation and installation project of outdoor sewage equipment on the first floor of the office buildingQuotation | |||||||||
| Serial Number | Division Name | Sub-item name | Technical standard/construction process | Construction Party Quotation | Remarks | ||||
| Estimated quantities | Unit | Specifications/Brand | Unit price | Amount | |||||
| 1 | Outdoor installation |
Installation of stainless steel waste Management tank |
Argon Arc, Plasma |
1 | Sleeve | 3000L |
Go to the temporary warehouse to move the equipment, Change the storage tank to 2 outlets and install To the specified location |
||
| Installation of high temperature submersible pump |
Argon arc, electric welding, |
2 | Sleeve | 50WQR13-30-3 |
Including pipe installation, modification One set of trap valve group, soft Pipe Link |
||||
Note: 1. Division name refers to the name of the business category, such as water engineering, electrical engineering, thermal insulation engineering, reactor replacement paddle engineering, etc.
2, sub-item name: refers to the specific details of the construction project,
3, technical standards are, construction technology: fill in must be standardized and accurate, such as rubber and plastic insulation project, is one floor or two floors; Board room, using rock wool
The board is still a thin iron board, with a frame in the middle, what is the frame spacing, etc.
4. Material cost: if the construction party buys materials, it needs to be filled in; If the construction party only cleages the work, it does not need to fill in.
Quotation Unit: (Seal)
Offer and telephone:
