Tender Notice

Carbon steel storage tank for anaerobic tank renovation of water purification station 100m ³

DIGA PHARMACEUTICAL GROUP SHARESLimited Company
Tender Notice for Carbon Steel Storage Tank for Anaerobic Pool Renovation of Water Purification Station 100m ³
Basic information of 1. project
1. Project (Material) Name: Carbon Steel Storage Tank for Reconstruction of Anaerobic Pool of Water Purification Station 100m ³
2. Location of demand: 268 Tianrun Road, Wendeng Economic and Technological Development Zone, Weihai
3. Demand Overview: See URS for details, 2 sets
4. Quality requirements: Comply with national mandatory standards and requirements of Party A
5. Time limit requirement: 30 days
6. Other requirements: quotation includes tax invoice and freight
2. Supplier Qualification Requirements
1. A valid business license shall be provided for a legal person or other organization registered in the People's Republic of China.
2, must have the ability to independently bear civil liability.
3, must have a good business reputation and sound financial accounting system, and can issue special VAT invoices.
4. It must have a good record of paying taxes and social security funds in accordance with the law within 3 years, and there is no record of major violations in business activities.
5, must have the necessary equipment and professional and technical capabilities to perform the project. Relevant supporting materials (including but not limited to professional qualifications, past successful cases and contracts) shall be provided.
6. Other conditions stipulated by laws and regulations.
3. Registration Instructions
1. This tender invitation announcement shall end on [September] [15] of [2024] and will not be accepted within the time limit.
2. If you are interested in participating, please sort out the above information (seal) before the deadline for announcement,Send to dijiazbb@163.com in the form of mail
Note: Please unify the mailNamed after "preliminary quotation of project name bidding unit name", please leave "contact person, position and contact information of the unit" (not less than two) in the body of the email.
3. Telephone number for consultation: [Li Wei 15106314392]]
4. After examination of qualified registration units, our staff will send detailed bidding documents by mail. Please check the mailbox in time. If you receive any, please reply and confirm by mail.
4. supervision and reporting methods
1. Reporting telephone number: 0631-3855888
2. Reporting Mailbox: zhengquanbu@dijiagroup.com
5. Other
The final interpretation of this tender belongs to our company. Please pay attention to the feedback information received by phone or email.
Company Name: DIGA PHARMACEUTICAL GROUP CO., LTD
Reporting Department: Equipment Department, Contact Wang Anbo 18816307086
Technical requirements:
1.2 sets of 100m vertical cone-top storage tanks are designed and manufactured according to the safety technical specification for AQ3053-2015 vertical cylindrical welded steel storage tanks. the main storage solvents are ethanol and ethyl acetate wastewater, with a service pressure of less than 0.1MPa, a service temperature of -15 ℃-50 ℃, and a service life of 10 years.
2. The storage tank is designed to be vertical, single-layer, with upper conical head, lower flat cover, upper head welded to the cylinder, and the interface is GB20592 standard RF flange: D = 4.2m,H = 7.5m, main body thickness δ = 10mm, upper head δ = 8mm, lower flat cover δ = 12mm, and effective charging above 100m (charging coefficient 0.95)
3. The storage tank is made of Q235 plate as a whole. The welding methods and materials are required to be carried out according to NB/T47015-2011 pressure vessel welding procedures. The welding records shall be included in the product quality certification documents and shall be subject to irregular on-site inspection by Party A. It is required that the weld on the surface of the storage tank should be flush, and there should be no welding slag, welding bead and burr. All kinds of fillet weld joints shall be ground with rounded corners of not less than 5mm. After passing the inspection, the outer surface of the equipment shall be derusted, and 3 coats of epoxy anticorrosive paint, 1 coat of primer and 2 coats of topcoat shall be applied.
4. Pipe orifice: the storage tank shall be provided with sufficient pipe orifices. The top pipe orifice: DN150 circulation port (inserted 200mm from the bottom, vacuum breaking),DN100 * 3 (exhaust, tail gas, safety valve),DN100 * 2 (standby), nitrogen/pressure port DN50 * 2, DN500 pressure relief manhole, side wall: 4 DN80 level gauge ports, M27 * 2 1 thermowell, 2 lower inlet and outlet ports DN150, 1 DN50 drain port, DN500 maintenance manhole, etc.
5. Accessories: equipped with pressure relief manhole (take-off pressure 1800pa), thermowell, manhole cover, spiral ladder, top operating platform guardrail, skirt, lifting lug and other basic accessories.
6. The transportation time of the equipment is included in the supply cycle, that is, the supply cycle referred to by Party A refers to the time of arrival at the place designated by Party A, and Party B is responsible for the transportation and bears the transportation costs.
7. Matters not covered shall be accepted on the basis of national compulsory standards such as safety technical specifications for vertical cylindrical steel welded storage tanks on the site of the owner and the AQ3053-2015.
Supplier:
Contact person and contact information:
No. Name Model, technical parameters Quantity Unit price Subtotal
           
           
Total Quotation:
Payment method: 30% in advance, 90% of the total payment before delivery, and 10% warranty (new customers must sign a quality agreement with a warranty of 18 months)
Invoice: 13% VAT special invoice (issued in the name of equipment)
Warranty period: one year after installation and commissioning or 15 months after delivery
Arrival date: within 30 days after advance payment
Place of arrival: Guangzhou Road, Wendengying Town, Wendeng District, Weihai City
Remarks: