Tender Notice

C8 roof air conditioning room renovation project

DIGA PHARMACEUTICAL GROUP SHARESLimited Company
C8 roof air conditioning room renovation projectTender Notice
Basic information of 1. project
1. Project (material) name:C8 roof air conditioning room renovation project
2. Location of demand: 268 Tianrun Road, Wendeng Economic and Technological Development Zone, Weihai
3. Demand Overview: See Annex for details
4. Quality requirements: Comply with national mandatory standards and requirements of Party A
5. Time limit requirement: 30 days
6. Other requirements: quotation includes invoice
2. Supplier Qualification Requirements
1. A valid business license shall be provided for a legal person or other organization registered in the People's Republic of China.
2, must have the ability to independently bear civil liability.
3, must have a good business reputation and sound financial accounting system, and can issue special VAT invoices.
4. It must have a good record of paying taxes and social security funds in accordance with the law within 3 years, and there is no record of major violations in business activities.
5, must have the necessary equipment and professional and technical capabilities to perform the project. Relevant supporting materials (including but not limited to professional qualifications, past successful cases and contracts) shall be provided.
6. Other conditions stipulated by laws and regulations.
3. Registration Instructions
1. This tender invitation announcement shall end on [August] [30] of [2024] and will not be accepted within the time limit.
2. If you are interested in participating, please sort out the above information (seal) before the deadline for announcement,Send to dijiazbb@163.com in the form of mail
Note: Please unify the mailNamed after "preliminary quotation of project name bidding unit name", please leave "contact person, position and contact information of the unit" (not less than two) in the body of the email.
3. Telephone number for consultation: [Li Wei 15106314392]]
4. After examination of qualified registration units, our staff will send detailed bidding documents by mail. Please check the mailbox in time. If you receive any, please reply and confirm by mail.
4. supervision and reporting methods
1. Reporting telephone number: 0631-3855888
2. Reporting Mailbox: zhengquanbu@dijiagroup.com
5. Other
The final interpretation of this tender belongs to our company. Please pay attention to the feedback information received by phone or email.
 
 
 
 
 
 
 
 
 
Attachments:
C8 Roof Air-conditioned Room Renovation Project Quotation
Serial Number
 
Division Name Sub-item name Technical standard/construction process Construction Party Quotation Remarks
Estimated quantities Unit Specifications/Brand Unit price Amount
1 C8 Roof Air-conditioned Room Fabrication and installation of steel structure Grinding, oil brushing, cutting, welding and handling 4.4 tons HN150*150*9*10
HN200*100*5.5*8
HN250*125*6*9
    The operation height is about 20 meters high, and the construction is difficult.
2 Fabrication and installation of C- shaped steel Handling, cutting and welding 4 tons 200*70*2.5
160*60*2.5
   
3 Installation of roof rock wool board   206 Square 720*95*5    
4 Wall panel installation   265 Square 310*95*5    
5 Buckle ground trim   400 Meters      
6 Fabrication and installation of column reinforcement plate Grinding, oil brushing, cutting, welding 96 Block      
7 Steel fixed bracket   70 One      
8 Fabrication and installation of rock wool door Handling, cutting, hemming 4 One      
9 Scaffold installation and disassembly   206 Square      
  Other expenses                
  Tax rate                
  Total                
 
Note: 1. Division name: refers to the business category name, such as water engineering, electrical engineering, thermal insulation engineering, reactor replacement paddle engineering, etc.
2. Sub-item name: refers to the specific detailed items of construction.
3, technical standards/construction technology: fill in must be standardized and accurate, such as rubber and plastic insulation project, is it one floor or two floors; Board room, using rock wool board or thin iron board, with a frame in the middle, what is the frame spacing, etc.
4. Material cost: if the construction party buys materials, it needs to be filled in; If the construction party is a contractor, there is no need to fill in the form.
 
 
 
 
Quotation Unit: (Seal)
 
Offer and contact number: