Tender Notice
A8 Second Floor East Collapse 10 m Platform Demolition and Handling Equipment Project
Announcement of Invitation for Bids for Dismantling and Handling Equipment Project of East Collapse 10 m Platform on 2nd Floor of A8
Basic information of 1. project
1. Project (Material) Name: Degas PharmaceuticalA8 Second Floor East Collapse 10 m Platform Demolition and Handling Equipment Project
2. Location of demand: 268 Tianrun Road, Wendeng Economic and Technological Development Zone, Weihai
3. Project overview: see attachment for details
4. Quality requirements: Comply with national mandatory standards and requirements of Party A
5. Time limit requirement: 30 days
6. Other requirements: quotation includes invoice
2. Supplier Qualification Requirements
1. A valid business license shall be provided for a legal person or other organization registered in the People's Republic of China.
2, must have the ability to independently bear civil liability.
3, must have a good business reputation and sound financial accounting system, and can issue special VAT invoices.
4. It must have a good record of paying taxes and social security funds in accordance with the law within 3 years, and there is no record of major violations in business activities.
5, must have the necessary equipment and professional and technical capabilities to perform the project. Relevant supporting materials (including but not limited to professional qualifications, past successful cases and contracts) shall be provided.
6. Other conditions stipulated by laws and regulations.
3. Registration Instructions
1. This tender invitation announcement shall end on [August] [20] of [2024] and will not be accepted within the time limit.
2. If you are interested in participating, please sort out the above information (seal) before the deadline for announcement,Send to dijiazbb@163.com in the form of mail;
Note: Please unify the mailNamed after "preliminary quotation of project name bidding unit name", please leave "contact person, position and contact information of the unit" (not less than two) in the body of the email.
3. Telephone number for consultation: [Li Wei 15106314392]]
4. After examination of qualified registration units, our staff will send detailed bidding documents by mail. Please check the mailbox in time. If you receive any, please reply and confirm by mail.
4. supervision and reporting methods
1. Reporting telephone number: 0631-3855888
2. Reporting Mailbox: zhengquanbu@dijiagroup.com
5. Other
The final interpretation of this tender belongs to our company. Please pay attention to the feedback information received by phone or email.
Attachments:
| Quotation for dismantling and handling equipment for the 10-meter platform on the second floor of A8 | |||||||||
|
Serial Number |
Division Name |
Sub-item name |
Technical standard/construction process |
Construction Party Quotation |
Remarks |
||||
| Estimated quantities | Unit | Specifications/Brand | Unit price | Amount | |||||
|
1 |
A8 Second Floor Interior Demolition |
Carbon steel pipe | gas welding angle grinder cutting | 18 | Meters | DN50 | |||
| Carbon steel flange | plasma angle grinder cutting | 6 | One | DN50 | |||||
| Carbon steel ball valve | Wrench | 2 | One | DN50 | |||||
| Dismantle the high and low temperature integrated machine | gas welding angle grinder cutting | 2 | Sleeve | Uc-a9530wdex | |||||
| Remove the linked valve group | Wrench | 2 | Sleeve | DN80 | |||||
|
Removal of high-level storage tank |
gas welding angle grinder cutting |
1 |
Taiwan |
500L |
|
|
Including stainless steel pipe DN40 ,10 meters, DN25, 2 6 m valves, flange 5, 6 elbows, support DN80 pipe 4 m, embedded parts 2 Block |
||
|
2 |
A8 second floor indoor installation |
Carbon steel pipe | electric welding argon arc welding | 18 | Meters | DN50 | |||
| Carbon steel flange | electric welding argon arc welding | 6 | One | DN50 | |||||
| Carbon steel ball valve | electric welding argon arc welding | 2 | One | DN50 | |||||
| Installation of high and low temperature integrated machine | electric welding argon arc welding | 2 | Sleeve | Uc-a9530wdex | To the northwest corner of the workshop | ||||
| Install linked valve group | Wrench | 2 | Sleeve | DN80 | |||||
|
Handling and installation of high-level storage tanks |
gas welding angle grinder cutting |
1 |
Taiwan |
500L |
|
|
Including stainless steel pipe DN40 ,10 meters, DN25, 6 meters, 2 valves, 5 flanges, 6 elbows, 1 bracket for reducing tee, DN80 pipe, 4 meters, 2 embedded parts |
||
| Pipe support | Electric welding angle grinder | 2 | One | L50 carbon steel angle iron | |||||
| 3 | Other expenses | Screw, elbow, angle grinder piece, oxygen | |||||||
| 4 | Tax rate | ||||||||
| 5 | Total | ||||||||
Quotation Unit: (Seal)
Offer and contact number: