Tender Notice

A8 Second Floor East Collapse 10 m Platform Demolition and Handling Equipment Project

DIGA PHARMACEUTICAL GROUP SHARESLimited Company
Announcement of Invitation for Bids for Dismantling and Handling Equipment Project of East Collapse 10 m Platform on 2nd Floor of A8
Basic information of 1. project
1. Project (Material) Name: Degas PharmaceuticalA8 Second Floor East Collapse 10 m Platform Demolition and Handling Equipment Project
2. Location of demand: 268 Tianrun Road, Wendeng Economic and Technological Development Zone, Weihai
3. Project overview: see attachment for details
4. Quality requirements: Comply with national mandatory standards and requirements of Party A
5. Time limit requirement: 30 days
6. Other requirements: quotation includes invoice
2. Supplier Qualification Requirements
1. A valid business license shall be provided for a legal person or other organization registered in the People's Republic of China.
2, must have the ability to independently bear civil liability.
3, must have a good business reputation and sound financial accounting system, and can issue special VAT invoices.
4. It must have a good record of paying taxes and social security funds in accordance with the law within 3 years, and there is no record of major violations in business activities.
5, must have the necessary equipment and professional and technical capabilities to perform the project. Relevant supporting materials (including but not limited to professional qualifications, past successful cases and contracts) shall be provided.
6. Other conditions stipulated by laws and regulations.
3. Registration Instructions
1. This tender invitation announcement shall end on [August] [20] of [2024] and will not be accepted within the time limit.
2. If you are interested in participating, please sort out the above information (seal) before the deadline for announcement,Send to dijiazbb@163.com in the form of mail
Note: Please unify the mailNamed after "preliminary quotation of project name bidding unit name", please leave "contact person, position and contact information of the unit" (not less than two) in the body of the email.
3. Telephone number for consultation: [Li Wei 15106314392]]
4. After examination of qualified registration units, our staff will send detailed bidding documents by mail. Please check the mailbox in time. If you receive any, please reply and confirm by mail.
4. supervision and reporting methods
1. Reporting telephone number: 0631-3855888
2. Reporting Mailbox: zhengquanbu@dijiagroup.com
5. Other
The final interpretation of this tender belongs to our company. Please pay attention to the feedback information received by phone or email.
 
 
 
 
 
 
 
Attachments:
 
Quotation for dismantling and handling equipment for the 10-meter platform on the second floor of A8
 
Serial Number
 
Division Name
 
Sub-item name
 
Technical standard/construction process
Construction Party Quotation  
Remarks
Estimated quantities Unit Specifications/Brand Unit price Amount
 
 
 
 
 
 
1
 
 
 
 
 
A8 Second Floor Interior Demolition
Carbon steel pipe gas welding angle grinder cutting 18 Meters DN50      
Carbon steel flange plasma angle grinder cutting 6 One DN50      
Carbon steel ball valve Wrench 2 One DN50      
Dismantle the high and low temperature integrated machine gas welding angle grinder cutting 2 Sleeve Uc-a9530wdex      
Remove the linked valve group Wrench 2 Sleeve DN80      
 
 
Removal of high-level storage tank
 
 
gas welding angle grinder cutting
 
 
1
 
 
Taiwan
 
 
500L
 
 
 
 
 
 
Including stainless steel pipe DN40 ,10 meters, DN25,
2 6 m valves, flange
5, 6 elbows, support DN80 pipe 4 m, embedded parts 2
Block
 
 
 
 
 
 
 
2
 
 
 
 
 
 
 
A8 second floor indoor installation
Carbon steel pipe electric welding argon arc welding 18 Meters DN50      
Carbon steel flange electric welding argon arc welding 6 One DN50      
Carbon steel ball valve electric welding argon arc welding 2 One DN50      
Installation of high and low temperature integrated machine electric welding argon arc welding 2 Sleeve Uc-a9530wdex     To the northwest corner of the workshop
Install linked valve group Wrench 2 Sleeve DN80      
 
 
 
Handling and installation of high-level storage tanks
 
 
 
gas welding angle grinder cutting
 
 
 
1
 
 
 
Taiwan
 
 
 
500L
 
 
 
 
 
 
 
 
 
Including stainless steel pipe DN40 ,10 meters, DN25,
6 meters, 2 valves, 5 flanges, 6 elbows, 1 bracket for reducing tee, DN80 pipe, 4 meters, 2 embedded parts
Pipe support Electric welding angle grinder 2 One L50 carbon steel angle iron      
3 Other expenses Screw, elbow, angle grinder piece, oxygen              
4 Tax rate                
5 Total                
 
Quotation Unit: (Seal)
Offer and contact number: