Tender Notice
A8C16 workshop exhaust installation and other steel
A8C16 workshop exhaust installation and other steelTender Notice
Basic information of 1. project
1. Project (Material) Name: Steel for Exhaust Gas Installation in A8C16 Workshop
2. Location of demand: 268 Tianrun Road, Wendeng Economic and Technological Development Zone, Weihai, Shandong Province
3. Demand Overview: See Annex for details.
4, quality requirements: in line with the national mandatory standards.
5. Time limit requirement: 30 days
6. Other Requirements: None
2. Supplier Qualification Requirements
1. A valid business license shall be provided for a legal person or other organization registered in the People's Republic of China.
2, must have the ability to independently bear civil liability.
3, must have a good business reputation and sound financial accounting system, and can issue special VAT invoices.
4. It must have a good record of paying taxes and social security funds in accordance with the law within 3 years, and there is no record of major violations in business activities.
5, must have the necessary equipment and professional and technical capabilities to perform the project. Relevant supporting materials (including but not limited to professional qualifications, past successful cases and contracts) shall be provided.
6. Other conditions stipulated by laws and regulations.
3. Registration Instructions
1. This tender invitation announcement shall end on [March] [25] of [2024] and will not be accepted within the time limit.
2. If you are interested in participating, please sort out the above information (seal) before the deadline for announcement,Send to dijiazbb@163.com in the form of mail;
Note: Please unify the mailNamed after "preliminary quotation of project name bidding unit name", please leave "contact person, position and contact information of the unit" (not less than two) in the body of the email.
3. Telephone number for consultation: [Li Wei 15106314392]]
4. After examination of qualified registration units, our staff will send detailed bidding documents by mail. Please check the mailbox in time. If you receive any, please reply and confirm by mail.
4. supervision and reporting methods
1. Reporting telephone number: 0631-3855888
2. Reporting Mailbox: zhengquanbu@dijiagroup.com
5. Other
The final interpretation of this tender belongs to our company. Please pay attention to the feedback information received by phone or email.
| Serial Number | Item Name | Specifications and models | Unit | Quantity | Unit price | Amount | Brand Error | Place of use |
| 1 | 316L stainless steel pipe | 76*4 | Meters | 70 | Fengye National Standard | A8 tail gas Yao | ||
| 2 | 316L stainless steel pipe | 57*3.5 | Meters | 120 | Fengye National Standard | A8 tail gas Yao | ||
| 3 | 316L stainless steel pipe | 108*4 | Meters | 140 | Fengye National Standard | A8 tail gas Yao | ||
| 4 | 316L stainless steel pipe | 89*4 | Meters | 80 | Fengye National Standard | A8 tail gas Yao | ||
| 5 | 304 stainless steel pipe | DN20*3 | Meters | 68 | Fengye National Standard | Decoration of the third floor of the scientific research building | ||
| 6 | H steel Q355B | 500*200*10*16 | Meters | 24 | Jinxi National Standard | A8 steel platform Wang Wei | ||
| 7 | 304 stainless steel pipe | dn200*6 | Meters | 90 | Fengye National Standard | C16 tail gas Yao | ||
| 8 | 304 stainless steel pipe | dn25*3 | Meters | 340 | Fengye National Standard | C9 DJ2302124 | ||
| 9 | Galvanized square tube | 80*100*3 | Meters | 72 | Youfa GB | E13 New ALC Firewall Zhai Yuzhen DJ2402038 | ||
| 10 | Seamless pipe | 219*6 | Meters | 240 | National Standard of Laigang | C8C9 Power Pipeline Yao | ||
| 11 | Seamless pipe | 159*4.5 | Meters | 400 | National Standard of Laigang | C8C9 Power Pipeline Yao | ||
| 12 | Seamless pipe | 133*4.5 | Meters | 84 | National Standard of Laigang | C8C9 Power Pipeline Yao | ||
| 13 | 304 stainless steel pipe | 108*4 | Meters | 80 | Fengye National Standard | C8C9 Power Pipeline Yao | ||
| 14 | iron plate | 100*1500*10mm | Block | 20 | Angang National Standard | C8C9 Power Pipeline Yao | ||
| 15 | Galvanized pipe | dn20*2.75 | Meters | 1002 | Youfa GB | C16 westernmost 12 series Li Zhenyu | ||
| 16 | Galvanized pipe | dn25*3.25 | Meters | 102 | Youfa GB | C16 westernmost 12 series Li Zhenyu | ||
| 17 | Galvanized angle iron | 40*40*4 | Meters | 252 | Hongxiang National Standard | C16 westernmost 12 series Li Zhenyu | ||
| 18 | Galvanized Flat Iron | 40*4 | Meters | 60 | Hongxiang National Standard | C16 westernmost 12 series Li Zhenyu | ||
| 19 | galvanized channel steel | 10# | Meters | 120 | Hongxiang National Standard | C16 westernmost 12 series Li Zhenyu | ||
| 20 | iron plate | 200*200*8mm | Block | 100 | Angang National Standard | C16 westernmost 12 series Li Zhenyu | ||
| 21 | 304 bright stainless steel seamless tube | 8*1 | Meters | 102 | Fengye National Standard | C16 westernmost 12 series Li Zhenyu | ||
| 0 | ||||||||
| Quotation includes tax and freight | ||||||||
| The supplier is responsible for unloading the goods to the designated position according to different types (including the goods need to be dumped from the truck to the trolley or on the ground due to narrow roads, transportation vehicles, cranes and forklifts cannot enter the site for operation and other reasons, and then manually handled. The small truck, crane, forklift and unloading workers are provided by the supplier and responsible for the expenses) | ||||||||
